GE Aviation Engine Services Singapore - SPM Vibro Polishing Machine Model LPG - EVO - MAG

Starts: 04 February 2026 at 04:00 GMT
Ends: 31 March 2026 at 08:00 BST
Surplus to requirements of ongoing business. Please refer to the Collection Information section (under the Essential Information tab) for detailed requirements and conditions relating to the removal process. NOTE: Vendor to approve all closing bids prior to Apex final invoicing.
Share:
Showing 1 of 1 lots
  • 0_10
    0_11
    0_12
    0_1_45bbdf11-7a4d-4316-bc7e-5e4841be5524.jpg
    0_2_201b1bfb-a5c4-4de9-82b3-d13597e86054.jpg
    0_3
    0_4
    0_5
    0_6
    0_7
    0_8
    0_9
    P7290679.JPG
    P7290680.JPG
    P7290681.JPG
    P7290683.JPG
    P7290684.JPG
    P7290685.JPG
    P7290686.JPG
    P7290689.JPG
    P7290690.JPG
    P7290692.JPG
    P7290695.JPG
    P7290699.JPG
    P7290700.JPG
    P7290701.JPG
    P7290702.JPG
    P7290703.JPG
    P7290704.JPG
    P7290705.JPG
    P7290706.JPG
    P7290707.JPG
    P7290708.JPG
    P7290709.JPG
    P7290710.JPG
    P7290711.JPG
    P7290712.JPG
    P7290713.JPG
    P7290714.JPG
    P7290717.JPG
    P7290718.JPG
    P7290719.JPG
    P7290720.JPG
    P7290721.JPG
    P7290722.JPG
    P7290723.JPG
    P7290725.JPG
    P7290729.JPG
    ge9x-greater-durability.jpg
     site
    LOT 1

    SPM Vibro Polishing Machine Model LPG - EVO - MAG (UP1) With Allen Bradley Touchscreen Control

    TECHNICAL DATA- Machine Power Supply Voltage VAC 400. Filtering Unit Power Supply Voltage VAC 230. Total Installed Electrical Power A 22 - 32. Power Supply Frequency Hz 50-60. Main Air Supply Pressure 6 bar. Pinch Valves Air Supply Circuit Pressure 2-3,5 bar. Diaphragm Valves Air Supply Circuit Pressure 6 bar. Compressed Air Supply Fitting G 3/8. Mains Water Supply Pressure 2 bar. Mains Water Supply Fitting G 3/4. Box Vibration Motor Power 4kW. Washing Unit Vibration Motor Power 3,2 + 3,2kW. Vacuum Power 4kW. Box Load Capacity 600kg. Box Dimensions W620 x D620 x 730mm. Washing Unit Capacity 315 Litres. Washing Unit Load Capacity (Polishing Media) 1,500kg. Delivery Pump Flow Rate L/s 0÷52 l/min (3,1 m³/h). Discharge Pump Flow Rate L/s 0÷52 l/min (3,1 m³/h). Vacuum Weight 170kg. Vacuum Dimensions W1,130 x D600 x H1,530mm. Total Machine Weight 2,400kg. Machine Overall Dimensions Without Cabin W2,310 x D1,500 x H1,750mm. Total Cabin Weight 600kg. Machine Overall Dimensions With Cabin W3,200 x D1,900 x H1,910mm.

Essential Information

General Information

Auction Dates
Starts: 04 February 2026 at 04:00 GMT
Ends: 31 March 2026 at 08:00 BST
Site Address
4 Seletar Aerospace Link
JTC Aerospace @ Seletar Aerospace Park
Singapore
797571
Singapore
Viewing Days
By Appointment Only
Viewings strictly by appointment only. Please contact Apex to make an appointment. Submit Name, Email, Citizenship, Company & Country for clearance. Safety shoes & glasses required for shopfloor access.

Fees & Payment

Currency
USD
Buyers Premium
18% or as specified on individual items
Payment

General payment information

  • Payment is due immediately on receipt of invoice.
  • All payments must be made in the currency on the invoice issued.
  • Accepted forms of payment are bank transfer ONLY. We do NOT accept payment by card, cash or cheque.

Goods

Clearance days
06 April 2026 at 02:00 BST - 10 April 2026 at 09:00 BST
Collections strictly by appointment only.
General Collection Information

Collection

GE reccomended rigger for dismantling and loading is Nitaki Machine Movers Pte Ltd.

https://nitaki.com.sg/

Please contact Rand

Tel:+65 9026 5622

Email: rand.tay@nitaki.com.sg or hongrui@nitaki.com.sg

If the successful buyer wishes to appoint their own contractor for dismantling and loading, this will be permitted subject to compliance requirements. The appointed contractor must submit a completed Risk Assessment Form together with all relevant insurance documents and certifications. Please note that the Risk Assessment Form must receive approval from our EHS team prior to the commencement of any dismantling works.

  • Buyers are fully responsible for removal of items plus all shipping and rigging charges.
  • Items are only available to collect once the transfered funds have cleared, and a collection appointment has been booked.
  • Buyers or third party movers must present an invoice to the on-site personnel when removing their items.
  • Buyers must complete the removal of items within the clearance deadline. Normal removal hours are Monday to Friday, from 9am to 4pm (local time) unless otherwise stated.
  • Contact and removal information will be emailed at the time invoices are issued.
Sales Contacts
Auction information
Kata Keresztes
69 Middle Street
Brighton
BN11AL
United Kingdom

 

+441273224466